
Strengthening SPS capacity
STDF/PPG/69
Start:
01/10/2005
End:
19/11/2005
Statut
Terminé
Valeur du projet (US$)
19,700
Contribution STDF (US$)
19,700
Bénéficiaires
Yémen
Show more
Entités de mise en oeuvre
Tim Huntington
Show more
Partenaires
Show more
Conduct a survey of SPS issues and design a project in the fisheries sector based on the Diagnostic Trade Integration Study (DTIS).
Bénéficiaires
Fermer
Partenaires
Fermer
Implementing Entities
Fermer